- Duration:3 Weeks
The goal of this project was to open up the kitchen and give it a complete makeover. First order of business was to add more light. Recessed lights were added, the wall was removed and a peninsula with pendant lights was added, cabinets, counterss and floors were replaced, a backsplash was added, the windows were replaced, and last but not least, a fresh coat of paint tied it all together!

PROJECT MANAGER
WILL ARMSTRONG

REMODELING SPECIALIST
RICH SCALZA
Project Overview




Phase 1: The Vision
The vision for this project was to completely gut the existing kitchen and remove the wall between the kitchen and dining room. Brighter colors were used and additional lighting was installed to brighten up the space!
Phase 2: Design
Initial renderings were created to help visualize the removal of the partition wall. A peninsula was also installed to help create more counter space and seating.
Phase 3: Construction
Total construction time for this project was 3 weeks. Here’s a behind the scenes look!
- Demolition
- Rough Electrical
- Window Replacement
- Drywall
- Trim
- Cabinet Installation
- Paint
- Flooring
- Final Plumbing
- Final Electric
The Final Product
A total transformation! This kitchen went from dark and cramped to bright and open. A perfect space for entertaining!